How to choose a machine’s inputs

Wiki: Setup, edge and devices

When to use this

A machine’s numbers come from five inputs: its run signal (running or stopped), its part count, its rejects, its cycle time and its energy reading. Each input is a measurement on that machine with the matching meaning. Use the Inputs list to see which measurement each number uses, and to answer when a machine has more than one candidate, for example a press with both a “Part Counter” and a “Shot Count”.

Steps

  1. Open the machine: Plant Structure or the facility map, then the machine’s name.
  2. Find the Inputs list on the machine’s overview, under the OEE cards.
  3. Read each row:
    • A measurement name and its latest value: that measurement is in use.
    • Not set: no measurement on this machine has that meaning yet. Give a measurement the meaning on its own page, or on the machine’s Measurements tab.
    • Adding 2 measurements until you choose (counts) or Combining 2 measurements until you choose (run signal, cycle time, energy): the machine has several candidates and nobody has picked one.
  4. To answer, open the row’s menu and pick the measurement. Each option shows its latest value, which helps tell a part counter from a shot counter. For part count and rejects you can also pick Add them together, which is right for a machine with parallel lanes that each count.
  5. The choice saves as soon as you pick it. From then on downtime, production, OEE, wallboards and the learned patterns all use the chosen measurement.

When the machine has no run signal

Some machines report a load, power or current reading but no running or stopped signal. When one of those readings clearly falls into a low group and a high group, the machine’s KPIs & targets tab offers it under KPI readiness, at the Run signal step, for example “This reading looks like it shows running above 7.5 kW”. The offer shows the evidence: the two groups, how far apart they are, and, when the machine has a part count, how many of its increases came while the reading was above that level.

  1. Click Preview and accept. The preview reads the last 7 days that way and shows the hours running, the number of stops, the longest stop, and a strip of running and stopped time.
  2. If it matches what you know of the machine, click Create run signal. This adds a calculated measurement named “Running from” and the reading’s name, gives it the run signal meaning, and makes it the machine’s run signal in one step.
  3. To change the level first, click Adjust first. It opens the “Running from a load, power or current threshold” form filled in with the proposal.
  4. If the reading does not show running, click Dismiss. The offer comes back only if the level moves by more than 15 percent or a different reading becomes the better fit.

Nothing uses the proposal until you accept it. Once you accept, the machine’s earlier downtime is rebuilt from the reading’s stored history: the new run signal’s past values are worked out from those readings with the same rule, and the stops are found from them. The line under the Inputs list shows the rebuild while it runs. Changing the level later applies from then on and does not rebuild the past.

When a machine loses its run signal or part count

When a machine no longer has a run signal, or no longer has a part count or rejects, because the meaning was taken off its measurement, the measurement was deleted, or nothing replaced a choice, the stops and counts found from that input stay until an admin removes them. The Inputs list then says what was found from the input that is gone: how many stops and production counts, and the dates they cover.

  1. Click Review and remove. The confirmation repeats the counts and dates and says what stays: stops someone gave a reason, a note or a work item, and counts someone entered by hand.
  2. Click Remove. The line under the Inputs list shows how far it has got, then what was removed and kept.

Removing cannot be undone. If the counts changed since you opened the page, nothing is removed and the list shows the new counts to confirm. Stops that stayed show From a run signal that was removed in the stop lists. Removing needs the admin role. Giving the machine a run signal or a part count again later finds its stops and counts again from the stored readings.

Notes

  • Choosing needs the user role. A viewer sees the same list with the menus disabled.
  • A machine with exactly one candidate needs no answer: that measurement is used automatically.
  • Until you choose, nothing changes: several run signals are read as one combined signal and several counters are added together.
  • If the chosen measurement is deleted, or its meaning changes, the choice is cleared and the row goes back to the automatic rule above.
  • A choice also rebuilds the machine’s past downtime and production from the readings already stored, the same way as when a measurement first gets its meaning. The line under the Inputs list shows how far it has got, then the date the history was rebuilt. Stops found this way have no reason recorded, and stops or counts a person entered or gave a reason for are never changed.
  • When older readings are kept only as hourly summaries, the line says from which date. History before that date is not rebuilt, because short stops cannot be seen in hourly summaries.
  • If the rebuild stops before it finishes, the line says why and shows Retry. Retry runs it again with the same inputs. It also runs again on its own when an input changes. Retrying needs the user role, or the admin role when the stopped work was removing history from a removed input.